Oceaneering International
Description
Cornerstone was called in by our client to look at hurricane damage to a large manufacturing facility in Panama City, FL. Hurricane force winds blew off pieces of metal siding up to 50 feet long throughout the building. Cornerstone replaced all damaged siding throughout the facility while allowing them to maintain normal production throughout the entire process. Some replacements were up to 150 feet high and required the use of substantial lifts and scaffolding. All safety and OSHA requirements were followed throughout.
Project details
- Client: Oceaneering International
- Project: Metal siding replacement
- Location: Panama City, FL
- Duration: 6 months